SPECIFICATION
RCC framed structure (columns for 2 floor 6nos 12mm dia),(beams 6 nos 12mm dia with including 2 cranked rod), (roof slab are 10mm and 8mm rod are used )
(tie beams are 12mm 4 nos 10mm 2 nos top and bottom), foundation depth is 5’ to 6’ feet. Basement height 2.5’ feet only , brick paneled walls (exterior Walls of 9”thickness and interior walls of 4.5”Thickness), plastering and painting, Roof slab 4.5” tk. Roof height 10’0” ht top level.
KITCHEN .
· Concealed copper wiring in conduits for lights, Fan and power plug points.*.Power outlets for Air conditioners in all bedrooms.*.Power outlets for geysers in all bathrooms.*.Power plug for cooking range, Microwave oven, Mixer/grinder in kitchen.*.plug points for refrigerator, TV., Audio system etc. wherever necessary. *.20 amps 3 phase supply for each unit and individual meter boards *.Anchor switches, wooden box are used.
LOFTS, WARDROBES & CUPBOARDS:
* Open type.
*One each in the kitchen and Bedrooms .
PAINTING: * Ceiling: 3 coats of white cem .
* Walls: 2 coat JK putty , one coat primer , 2 coats of supercem
* Door and grill – one coat primer, two coats of Enamel Painting.
* Outer 2 coat of white cem..
MIXING RATIO:
* Brick work : 1:7- 9”tk .
* Flooring Pcc : 1:5:10.
* Ceiling plastering : 1:3 & 1:5.
* Wall plastering : 1:5.
* Water tank .
* Septic tank .
* Compound wall with gate.
* Bore well connection .
* Safety grill door .
* Demolishing & cleaning .
* Extra bath fittings & electrical fittings.
* Building setback flooring work.
* Step tiles.
Owner’s responsibility:
connection charges including the wire
from the meter board to the post will be
collected from the owner.
* E.B charges during construction time. . Water supply arrangement for construction.