                                                         SPECIFICATION          

  STRUCTURE :        ---            
                                             RCC framed structure  (columns for 2 floor 6nos 12mm dia),(beams 6 nos 12mm dia with including 2 cranked rod), (roof slab are 10mm and 8mm rod are used )
  (tie beams are 12mm 4 nos 10mm 2 nos top and bottom), foundation depth is 5’ to 6’ feet. Basement height 2.5’ feet only , brick paneled walls (exterior Walls of 9”thickness and interior walls of 4.5”Thickness), plastering and painting, Roof slab 4.5” tk. Roof height 10’0” ht top level.

  DOORS:                .                 Good quality of Flush occurs with Malaysian Sal wooFrames mad for PADAK first qty, good quality lock,  Power coated Handle, tower bolt OR equal ant,     (Teak wood  for main door and frames with brass fittings)

 WINDOWS:                                    . Powder coated aluminum sliding type, (or) 2ND teak  wood frame and shutter  with Plain glass and  MS grill 10 sqmm rod are used


   KITCHEN                                      .
                                                            Granite platform 10’0” length, stainless steel sink (Single bowl).

 BATHROOMS:                                 EWC or IWC and wash basin of parryware or Nicer brand in all bathrooms. Chromium plated fittings. (anchor or equal brand are used)Hot and cold water mixer with shower Provision for geysers in all bathrooms

  ELECTRICALS:                                .
·        Concealed copper wiring in conduits for lights, Fan and power plug points.*.Power outlets for Air conditioners in all bedrooms.*.Power outlets for geysers in all bathrooms.*.Power plug for cooking range, Microwave oven, Mixer/grinder in kitchen.*.plug points for refrigerator, TV., Audio system etc. wherever necessary. *.20 amps 3 phase supply for each unit and individual meter boards *.Anchor switches, wooden box are used.


LOFTS, WARDROBES & CUPBOARDS:      

                                    * Open type.
                                    *One each in the kitchen and Bedrooms .


PAINTING:                   * Ceiling: 3 coats of white cem .
                                   * Walls: 2 coat JK putty , one coat primer , 2 coats of supercem 
                                   * Door and grill – one coat primer, two coats of Enamel Painting.                  
                                   * Outer 2 coat of white cem..

MIXING  RATIO:
                                                           * All  Rcc works        :  1:2:4.
                                                                 * Brick work              :  1:7- 9”tk .
                                                                 * Flooring Pcc            :  1:5:10.
                                                                 * Ceiling plastering    :  1:3 & 1:5.
                                                                 * Wall plastering        :  1:5.

  Excluded items :                              
                                                           * Water tank .
                                                     * Septic tank .
                                                     * Compound wall with gate.
                                                     * Bore well connection .
                                                     * Safety grill door .
                                                     * Demolishing & cleaning .
                                                           * Extra bath fittings & electrical fittings.
                                                           * Building setback flooring work.
                                                           * Step tiles.


              Owner’s responsibility:               
                                                                  * Service connection & temporary
                                                                     connection charges including the wire
                                                                     from the meter board to the post will be
                                                                     collected from the owner.
                                                                  * E.B charges during construction time.                                                                               .          Water supply arrangement for construction.


 -- Thanking you --